![]() |
Kitsap Rifle & Revolver Club Established in 1926 for Sport and National Defense |
|||||
| (360) 373-1007 | 4900 Seabeck Hwy NW; Bremerton, WA 98312 |
info@gunsafety.org |
||||
|
|
||||||
|
CLUB WORK PARTY PROJECTS
Check back often as this list will be updated frequently! Last Update: 07-12-2008 1. ADA Ramp Construction - Finish Rough Grade, compact, finish grade, concrete form work - Materials needed include reinforcement wire, form material, cold joint material. 2. Assemble shooting bay sun/rain shelters - Material needed include 5 gal. buckets, cement to fill buckets 3. Finish Pistol line enclosure - Hang end doors and hardware 4. Sani-Can Repair/Maintenance - Pressure wash, repair roofs, remodel dispensers 5. Plan and install low water shut-off for club well New signage throughout the range. - Organize right end of rifle line - Organize USABLE "raw materials" and discard trash Place old gate over back bay access road Repair discipline props Build Bianchi Barricades and props for the Courage Classic Move remaining range items from right side of rifle line Reclaim recyclables - Lead/Brass/Aluminum Install add-on's to security system Skirt office Clean roofs and gutters Paint: There are many thing that need paint at the range. Target Stands: There are several designs we use for various events. Plans to be listed soon for at home projects. Landscaping: Flowers and grooming to put a finished touch on the range Etcetera Etcetera Etcetera |
|||||